Skip To Main Content

Armtec

Kirkland Lake Bridge Plate Installation

Watch how Bridge Plate was assembled by crane in 1.2m long rings at the Macassa Mine Complex without any disruption to rail traffic.

Start The Project With Armtec

Trust the largest manufacturer of water management and infrastructure solutions in Canada

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.