× Notice: This website or its third-party tools use cookies, which are necessary to its functioning and required to achieve the purposes illustrated in the cookie policy. If you want to know more or withdraw your consent to all or some of the cookies, please refer to the cookie policy. By closing this banner, scrolling this page, clicking a link or continuing to browse otherwise, you agree to the use of cookies.
×
Serving our customers through changing times.

Discover our new online meeting tool

Schedule a one on one virtual planning session with a professional civil engineer.

Connect With an Engineer

Suncor Energy Station – Soil Retention

Owner: TransAtla Energy Corp.
Engineer: Associated Engineering & Voice Construction ltd.
Location: Fort McMurray, AB
Date: May, 2019

The main facility at Suncor Energy process plant requires a lot of power. Constructed in 2006 these massive galvanized gravity walls are the staging pad book ends for the Trans Alta Energy Sub Station Electrical Protection Project. The two Armtec Bin-Walls span approximately 110 metres long x 8 metres high and act to retain the soil at the substation pad.

Bin-wall is a galvanized steel retaining wall in which an earth mass inside the bin acts as a gravity wall and steel members hold the earth mass intact. Bin-Wall has been used for retaining walls, bridge abutments, wing walls, boat docks, solid waste transfer units and loading ramps since 1934.

Bin-Wall was chosen for this project because:

  • Proven track record for fast assembly
  • Overall cost savings during assembly and installation
  • Experienced field support by an Armtec representative
  • Two Armtec Bin-Walls that span approximately 110 metres long x 8 metres high