× Notice: This website or its third-party tools use cookies, which are necessary to its functioning and required to achieve the purposes illustrated in the cookie policy. If you want to know more or withdraw your consent to all or some of the cookies, please refer to the cookie policy. By closing this banner, scrolling this page, clicking a link or continuing to browse otherwise, you agree to the use of cookies.
×
Serving our customers through changing times.

Discover our new online meeting tool

Schedule a one on one virtual planning session with a professional civil engineer.

Connect With an Engineer

Terraspan® GRS Arch

Owner: District of Chetwynd
Engineer: Terratech Consulting Ltd.
Contractor: Landmark Solutions Ltd.
Location: Chetwynd, BC
Date: May, 2019

Chetwynd is located in the foothills of the eastern slope of the Rocky Mountains. Located at the junction of Highways 97, 29 and the Canadian National Railway mainline, Chetwynd is the natural transportation hub of the mighty Peace River area.

During the summer of 2011, the Peace Region of British Columbia experienced abnormally large rainfall volumes over a 48 hour period-up to 150mm in some areas. During this storm event, a Structural Plate arch that carries Widmark Creek under 46th Street washed out, closing 1 of 2 access points to the District of Chetwynd industrial park. The District needed to restore access to the industrial park as rapidly as possible in order to prevent loss of revenue for its many clients.

Based on partnering history, Urban-Systems Ltd. contacted Armtec while developing the preliminary design for a replacement structure with concrete footings. Armtec quoted within the requested budget price and suggested they use a Terraspan® GRS Arch™ instead of a conventional arch structure. Conventional soil-steel structures consist of a steel shell supported on rigid footings surrounded by a
compacted backfill envelope—load is transferred into the shell in the form of ring compression and directed into the concrete footings below.

The GRS (Geosynthetic Reinforced Soil) design employs tightly spaced layers of woven geotextile within the compacted soil envelope—the
composite effect of the soil – geotextile combination dramatically increases stiffness of the backfill soil envelope, and decreases load transfer to the steel arch. Field experience shows the shell acts as a type of formwork during construction to aid in promoting soil arching. Instead of load being supported by the steel shell, it is transferred to the reinforced soil and eliminates the need for time consuming, costly footings.

Urban-Systems Ltd. chose the Terraspan® GRS Arch™ because it maintained the existing right-of-way and also a low profile with a large hydraulic capacity. The owner was pleased by the lower long-term maintenance costs of this arch versus a bridge installation. In order to fast track the installation, the contract was directly awarded to Landmark Solutions Ltd. out of Salmon Arm, British Columbia. Landmark
Solutions specializes in GRS construction, having installed dozens of structures in both British Columbia and Alberta. The demolition of the existing structure started October 31, and the Terraspan® GRS Arch™ materials (including the Bridge-Plate shell, welded wire mesh wall forms and woven geotextiles) were delivered by Armtec on November 3, 2011.

Installation of the buried watermain, preparation of the streambed and foundation, and final installation of arch was completed in exactly
two weeks.