× Notice: This website or its third-party tools use cookies, which are necessary to its functioning and required to achieve the purposes illustrated in the cookie policy. If you want to know more or withdraw your consent to all or some of the cookies, please refer to the cookie policy. By closing this banner, scrolling this page, clicking a link or continuing to browse otherwise, you agree to the use of cookies.
×
Serving our customers through changing times.

Discover our new online meeting tool

Schedule a one on one virtual planning session with a professional civil engineer.

Connect With an Engineer

Neptune Bulk Terminals Dust Shroud

Owner: Neptune Bulk Terminals
Engineer: Neptune Bulk Terminals Consultant
Contractor: Graham Construction & Brymark Installations Group Inc.
Location: North Vancouver, BC, BC
Date: January, 2021

Neptune Bulk Terminals commissioned a new dust shroud for their Dumper Building. The structure would manage atmospheric emissions by preventing the spread of dust during operations. Neptune Bulk Terminals contacted Armtec through their consultants to determine whether a structural plate product could meet the project requirements.

Neptune Bulk Terminals required a structure to enclose two fully loaded coal railcars within the Dumper Building in order to prevent the spread of coal dust during rotation into the Tandem Dumper. Several parameters were critical in the design. The structure needed to be self-supporting while providing the necessary clearance. A three-section design was required to allow lifting of one of the sections for maintenance or derailment of the coal railcars. Each section required an access hatch at the top of the Shroud to allow the removal of drive motors for repair plus a side opening for a large ventilation blower. Finally, the additional load of walkways connected to the Shroud also needed to be incorporated into the design. 

Neptune Bulk Terminals reached out to Armtec through their consultants to inquire whether a segmental plate product could be constructed for the 11m span x 5m rise structure. Armtec proposed the use of Bridge Plate, a Deep Corrugated Structural Plate (DCSP) product allowing spans up to 18m. Additional curved reinforcing “Ring” beams would be required to frame the large openings in the dust shroud similar to mine hopper openings on corrugated plate reclaim tunnels. 

Armtec Engineers began design on the new Bridge Plate Dust Shroud to meet operational and installationrequirements. The structure consisted of three sections allowing the necessary access while meeting external loading constraints. Engineers proposed 8.0mm thick galvanized steel to withstand the harsh industrial environment anddeliver an extended service life. Care was taken to ensure the dust shroud would not interfere with other keyoperating equipment once installed. 

As the preliminary phase progressed, Armtec was able to accommodate a number of design changes throughout the project. With many moving components on the jobsite, Armtec produced over 75 pages of detailed shop drawings including the numbering of each plate and beam section to assist the Contractor during installation. Pre-assemblyof the sections on a staging area, prior to hoisting into final position, allowed installation to proceed quickly andavoided fabrication over the open pit of the Dumper. The external Radius “Ring” Beams were attached to the sections and then each section was lifted by crane into their final positions over the Tandem Dumper. 

From the very beginning, Armtec was able to demonstrate its ability to provide a unique, one-of-a-kind structureby sharing past projects and engineering knowledge. The Bridge Plate Dust Shroud installation was successfullycompleted over a two-week period at the end of 2020, with remaining work scheduled for completion in Q1 of 2021.

Armtec Bridge Plate 11.730m span x 5.223m rise x 14.4m long x 8.0mm gauge 